Been a while since I have posted as I wait for my SLC. I have been really impressed with many of the builds that are in progress. I am ready to join the fray. I have heard a rumor that it is close??? I have a few options that have held things up. Fran is mating the engine/Graziano, installing my cats, muffler and side exhaust, and providing the new interior tub in addition to the body fitment, "Fling Wing", and cutouts. I know there has been a wait on the flywheel and clutch and the interior tub- I think that has been the hold up. Hopefully we are close. :shrug: