Nearly Christmas and work continues apace. Should be a heap of goodies that were bought in Aug/Sept arrive on the boat in the next week or two. Also a few things recently ordered that are being air freighted in just so I won't run out of things to do over Christmas.
Working on the motor/trans at present. It's the first time I've prepared an American V8 so what I don't know will fill a book!
Anyway, recently got the new reciprocating assembly back from cracktesting by my mate at the airways NDT facility. All good, so in for balancing (internal of course) last week on a Sunnen DCB-750. Not much to do, one slug of Mallory. All Lim's flywheel/clutch machining was spot on and in perfect balance.
I have increased the step on the triple plate clutch from 3mm to 5mm and will initially fit 2mm shims under the cover to achieve the correct setup pressure. We have machined three sets of shims , 2.0, 1.3, and 0.65 and will fit these in turn rather than replacing clutch plates as the friction faces wear. Should get four times the life out of the plates.

And I haven't even got a Jewish/Scottish ancestry!
Below is the clutch cover with the three sets of shims.