Here are some current pictures of the progress that Dale and I are making on the build. We have the engine and tranny installed and all of the plumbing and most of the wiring done. We just have a little more to do on wiring the dash and then we should be able to light the candle on this thing. Spent a lot of time polishing aluminum but I think it's going to pay off in the end. We're doing our best at hiding most of the wiring but that can be a real challenge with this particular car ( no place to hide).Not techno, here is the order I wanted.
Attachments
-
GT 40, shower, school 2011 294.JPG127.3 KB · Views: 366
-
GT 40, shower, school 2011 296.JPG142.3 KB · Views: 407
-
GT 40, shower, school 2011 301.JPG126.9 KB · Views: 383
-
GT 40, shower, school 2011 303.JPG135 KB · Views: 372
-
GT 40, shower, school 2011 306.JPG132.8 KB · Views: 408
-
GT 40, shower, school 2011 307.JPG132 KB · Views: 348
-
GT 40, shower, school 2011 309.JPG131.4 KB · Views: 369
-
GT 40, shower, school 2011 310.JPG139.3 KB · Views: 341
-
GT 40, shower, school 2011 315.JPG129.6 KB · Views: 392
-
GT 40, shower, school 2011 335.jpg268.6 KB · Views: 368